Skip to Content

REGULATORY COMPLIANCE

SPCC Planning & Compliance (40 CFR 112)

Professional PE-certified engineering and compliance services for industrial tank terminals. We ensure strict regulatory adherence through STI SP001 inspections and optimized secondary containment design.

Our Core Compliance Services


SPCC Plan Development

Full technical plan preparation and Professional Engineer (PE) certification for facility compliance.


Containment Engineering

Hydraulic calculations and custom structural design for spill prevention and containment berms.


STI SP001 
Testing

Certified integrity inspections for shop-built tanks to ensure structural health and leak prevention.

Who Needs an SPCC Plan?

Determine if your facility falls under the 40 CFR 112 regulatory threshold.

1

Aggregate Capacity

Aboveground > 1,320 Gallons?

2

Risk Assessment

Potential Discharge to Navigable Waters?

Compliance Status

Full SPCC Plan Required by Law

Certified By

API

OSHA

ISO 9001

EPA

SPCC Readiness Checklist

Download our 20-point inspection guide to see if your facility is ready for an EPA audit.

Download Now (PDF)

Educational Resource

SPCC Academy Course

Train your operators on spill prevention and emergency response procedures.

Learn More

SPCC FAQs

Plans must be reviewed and re-certified every five years, or whenever there are technical changes to the facility.

It applies to non-transportation-related facilities that store petroleum-based oils and certain non-petroleum oils.

A standard for the inspection of aboveground storage tanks that meet certain size and configuration requirements.